Conjunctured 1309 E. 7th St., Austin · 2008 to 2014

Archive / Chapter 7 of 8 / 2010 to 2013

The Almost-Leases

Demand for coworking was growing and the obvious next step was a bigger lease. This chapter shows the spaces Conjunctured tried, the two it nearly signed, and why it stopped.

The leases

Signed and never signed

Five properties across six years: one home house, one six-month test, two large leases walked away from, and one partner meeting room.

2008

1309 E. 7th St

The home house, where the community lived from the start.

Home location
2010

The house next door

Former psychic's house, taken over, new floors, painted at a community event. No heat in winter, not renewed.

Not renewed
2011

South Lamar

Multi-office space for South Austin.

Never signed
2012

Downtown warehouse

10,000 sq ft, after investor partnerships.

Never signed
2013

The Annex

On E 5th Street, for corporate workshops and trainings.

Opened with a partner

2010

The house next door

For years the neighbor was a psychic, "Emma's Spiritual Cleansings." When that lease came up, Conjunctured took over the property, put in new floors and painted it at a community event. In winter the heat did not work and space heaters were not enough, so they did not renew when the lease came up. It later became a Kebabalicious restaurant, which was good to have next door.

2014 Closing Post Aug 7, 2014

"In 2010 the community banded together to remodel the little house next door that was previously occupied by a psychic. After a six month test lease, we cut our ties and focused on other avenues of growth."

October 24, 2010

Fixing up 1311, next door

Members painting the second house on the day it was fixed up. Conjunctured posted these to Flickr under the title "Moving Next Door": "We've expanded to 1311 next door. Here are some of our fix up pictures."

A group gathers in an empty front room, the door open to daylight
A group gathering in the empty front room.
A painter mid-kick with a paint roller in one hand
Painting with some style.
Two people painting a wall white from step stools
Two painters, one wall.
A painter stretching a roller up to the ceiling
Reaching the ceiling.
The front room with paint cans and drop cloths on the floor
The front room mid-job, paint on the floor.
A barefoot painter pouring paint into a tray
Pouring the next tray.
A painter in a bright corner room with two windows
A painter in the corner room.
A painter reaching to the top of a wall with a roller
Rolling the top of the wall.
Three people talking in a half-painted room, one in a STAFF 08 shirt
Talking in a half-painted room.
White handprints pressed onto a wall
White handprints on the wall.
A woman with white paint on her hand, laughing
White paint on her hand.
A painter edging the trim next to a doorway
Cutting in along the trim.
Two painters reaching for the ceiling at the same time
Two rollers on the ceiling.
A painter on a stool and others working across one room
The whole room at once.
A painter sitting on the floor with a paint tray
Painting from the floor.
A painter at the kitchen counter with a cup in hand
The kitchen.
A painter by the red front door with a roller and tray
By the red front door.
A painter brushing paint along a window frame
Window trim, by hand.
The side of the house and yard, with a board on the ground
The side yard.
A barred window on the outside of the white house
Outside, a barred window on the house.

2011 and 2012

Two leases, never signed

A multi-office space in South Austin in 2011, then a downtown warehouse in 2012, after the team had built partnerships with investors. Neither lease was signed.

2014 Closing Post Aug 7, 2014

"In 2011 we nearly signed a lease on a multi office space off South Lamar that would have housed the high demand for coworking in South Austin."

"In 2012, feeling a high after building partnerships with multiple investors, we nearly signed a least on a 10,000 sq ft warehouse space in downtown."

The original spells "least"; the quote is kept as written. From the 2014 closing post.

2013

The Annex

The Annex was on E 5th Street, for corporate workshops and trainings. It sold meeting time, not desks. In September 2013 it listed a 600+ sq. ft room and two options: rent the room, or have it facilitated.

Closing Post Sep 16, 2013

"It was an experiment based on the increased meeting room interest we had been receiving."

"Our new meeting space, The Annex, is designed for maximum creativity and productivity."

From the 2014 closing post and /meet-here/meeting-annex.

July 23, 2013

Why they stopped

Part one of a series on corporate coworking opens with what the founders had learned from trying to grow by lease.

Original Blog Post Jul 23, 2013

"On several occasions we came frighteningly close to signing leases on BIG and very costly spaces."

"For quite some time we were driven to have multiple spaces here in Austin. Not so much any more."

"there are such awesome coworking spaces [...] already spread throughout Austin, that that need is already being met."

August 7, 2014

The one lease they did not take

Even at the end, the closing post says demand for the house was not the problem, and the founders chose not to move members to a larger East Austin space.

2014 Closing Post Aug 7, 2014

"we elected not to renew the lease on East Seventh street and made the tough decision not to bring our current members and future members to a new larger space in East Austin"

From the 2014 closing post. Chapter 8 covers the closing.

Then

Conjunctured tested one small house, passed on two big leases, and tried a meeting room. The people were in the first house. A larger lease did not add more of them.

Now

Growth by lease is the trap: a bigger space is not a bigger community. A coworking feasibility study tests demand before you commit to square feet.